First semester school assignment
Process: 2 months
Year: 2010
Materials: plaster, enginepart, wire, plywood
Size: 1100 x 450 mm
Weight: +25kg
Staging an enginepart.
Our first assignment was to dismantle an engine-block choose an interesting part and stage it's function in a cast made from plaster. The cast had to be square on the outside while the inside was confined to a 2x2cm orthogonal grid. Later we had to build a wireframe and work with the negative space it created.
Staging an enginepart.
Our first assignment was to dismantle an engine-block choose an interesting part and stage it's function in a cast made from plaster. The cast had to be square on the outside while the inside was confined to a 2x2cm orthogonal grid. Later we had to build a wireframe and work with the negative space it created.